The comprehensive design of the HVAC system for the entire hospital infrastructure in Puerto Boyacá, including critical units such as ICUs, operating rooms, recovery rooms, emergency rooms, hospitalization areas, and laboratories.
The system is supported by a chilled water plant with a capacity of 200 tons of cooling, ensuring strict compliance with the standard. ASHRAE 170 in all facilities, ensuring optimal ventilation, temperature, and contaminant control in healthcare spaces.
Subscribe to our newsletter to receive updates and articles about the company.
Copyright © 2025 SAGI, All rights reserved.